Contact Us
- welder@xionggu.com
- 86-28-87854487
- 100 Tiancai Road, High-tech Zone, Chengdu, Sichuan, China
Xionggu Automatic Welding Machines Serve Meng'xi LNG Pipeline
9 spreads of Xionggu automatic welding machines serve Meng'xi LNG pipeline project. Meng'xi pipeline phase I project has a total length of 413.5km and a pipe diameter of 1016/914mm. Eight new stations, one reconstructed station, 19 valve chambers and one dispatching center are built along the line. The project starts from Tianjin LNG Lingang off load station and ends at Baoding Dingxing off load station.
It is China's first clean energy “artery” leading directly to Xiong'an new area. The project is listed as the “natural gas interconnection plan” of the National Development and Reform Commission, and is interconnected with the natural gas trunk lines of the national pipeline network such as Shaanxi Beijing second and third line, Sino-Russia eastern line and Beijing Tianjin Hebei branch network, Promote the layout of natural gas infrastructure around the Bohai Sea, solve the "bottleneck" problem restricting the export of LNG natural gas in Tianjin, so that the 6.6 billion m3 / a allocated gas of Tianjin floating LNG terminal can be timely absorbed and released through the Meng'xi pipeline. Xionggu internal welding machine and dual torch external welding machine have participated in construction of the project since May 2021.
“Recommend”
- Xionggu automatic welding machine helps the construction of Zhundong coal-to-gas pipeline project
- Chinese power: Xionggu fully automatic welding machine helps Abu Dhabi West-East Oil Pipeline construction
- The Xionggu automatic welding equipment is about to embark on a new chapter i
- The major Sichuan-East Gas Transmission Project started, Xionggu welding equipment came to help
- Sichuan-East Gas Transmission Line 2 Project Starts, Xionggu Pipeline Automatic Welding Machine Helps Construct Energy Arteries
- Xionggu ultra-low temperature automatic welding equipment
- The quality of Xionggu pipeline automatic welding machine is trustworthy
- Xionggu Pipeline Automatic Welding Equipment Assists the Crossing Project of the South to North Water Diversion Project in Mengxi County
- Xionggu Pipeline Automatic Welding Machine Assists the 2nd lot of directional drilling in the middle section of the 3rd West-East gas pipeline
- Xionggu Pipeline Automatic Welding Machine Newsletter: The construction of the first lot of the 3rd West East Gas Pipeline has resumed
【editor】:xiongguCopyright:https://www.xg1992.comReproduced please indicate the source