-
A-230 All Position Automatic Welding Machine
More +Function: It can be used for all position welding of water pipe and large cylinder. GMAW/FCAW-GS/ GTAW welding processes can be applied. It is suitable for automatic welding of various bevel design, there are three types of bands/tracks to be selected.
Configuration:Welding head, adapter, external wire feeder, welding torch, portable panel, control cables, welding power source.
-
A-610 Dual Torch Automatic All Position Pipeline Welding Machine
More +Function:It is suitable for root pass, hot pass, filling and capping of pipeline welding joint by GMAW-S/GMAW-P/FCAW-GS welding processes in the field.
Configuration:Welding head, wire feeder, central controller, portable panel, welding power source, water cooler, water cooled torch, control cables.
-
A-800 Automatic Internal Pipeline Welding Machine
More +Function:It is suitable for high efficiency automatic GMAW welding of pipeline internal circular seam.
Configuration:Machine host, central controller, reach rod assembly, welding power source adapter and dedicated welding power source.
- [OUR CASES]Sichuan-East Gas Transmission Line 2 Project Starts, Xionggu Pipeline Automatic Welding Machine Helps Construct Energy Arteries2025-01-21- 10:11
- Congratulations on the launch of the Sichuan-Eastern Gas Transmission Line 2 project. Xionggu Automatic Welding will continue to weld silky smooth welds.
- Read(150005)
- [根栏目]Welding flowers under Xionggu pipeline automatic welding machine2024-05-17- 15:13
- Together with automatic welding machines, they completed one arduous task after another, demonstrating the beauty and power of labor.
- Read(150011)
- [OUR CASES]The Xionggu’s automatic welding machine fearlessly battles the harsh winter and snowstorms!2024-05-11- 15:43
- Its efficiency and stability earned praise and recognition from all the project team members.
- Read(150037)
- [NEWS]How is the Xionggu welding machine that served Dongfeng Shipyard 30 years ago now?2024-03-21- 15:19
- Kumagai welding machine is still dedicated in the long river of history
- Read(150017)
- [OUR CASES]Xionggu ultra-low temperature automatic welding equipment2024-01-15- 15:38
- Xionggu pipeline automatic welding machine is how to withstand the test of cold
- Read(150000)
- [根栏目]Xionggu automatic welding machine appeared in the 16th National Engineering Construction System Vocational Skills Competition2023-11-24- 15:15
- On the morning of November 5, the opening ceremony of the Tianjin Division of the "2023 National Industry Vocational Skills Competition-The 16th National Engineering Construction System Vocational Skills Competition" was held at Sinopec Fourth Construction Company.
- Read(150023)
- [OUR CASES]Xionggu welding machine improves quality and efficiency of water supply projects in Xinjiang irrigation areas2023-11-24- 14:58
- a local irrigation district water supply project expressed its strong long-term cooperation intention to Xionggu Company and plans to introduce more Xionggu welding machines again to improve project quality and efficiency.
- Read(150041)
- [OUR CASES]Xionggu pipeline automatic welding machine shines in pipeline network construction2023-10-31- 09:08
- The overall pipeline of the main line pipeline project in the Xinjiang section of the "West-East Gas Pipeline" fourth-line natural gas pipeline project, with a total length of 583 kilometers, has been officially completed after more than a year of construction and welding.
- Read(150017)
- [OUR CASES]Xionggu pipeline automatic welding machine has played an important role in this pipeline project2023-09-27- 15:26
- Xionggu Pipeline Automatic Welding Machine is an advanced welding equipment that can achieve efficient and precise welding.
- Read(150032)
- [OUR CASES]The second bid section of the West Fourth Line successfully completed the main line welding task2023-09-27- 14:39
- The Fourth West-East Gas Pipeline Project had achieved the first-time pass rate of welding reached 98.8%.
- Read(150019)
- [OUR CASES]Xionggu pipeline automatic welding machine makes welding easier and more reliable2023-08-31- 15:36
- Our process makes welding more precise and ensures high quality welding.
- Read(150010)
- [OUR CASES]Xionggu Pipeline Automatic Welding Machine Information, this section has completed the main welding task!2023-08-18- 18:57
- As of June 8, this section has welded a total of 9746 welds, with a first-pass welding qualification rate of 98.12%.
- Read(150014)
- [OUR CASES]Xionggu pipeline automatic welding machine helps the construction of Tuoba Hydropower Station!2023-07-28- 18:13
- The high-strength steel water pipes of Yunnan Weixi Tuoba Hydropower Station have a diameter of 10400mm and a thickness of 38mm. The carbon arc gouging groove is adopted, and the xionggu A-230 water pipe automatic welding machine is used for welding.
- Read(150020)
- [OUR CASES]The pipeline has been fully connected. Let's go find the presence of the Xionggu pipeline automatic welding machine.2023-07-26- 15:34
- On July 1, 2023, the ground skeleton project for the Bozi-DaBei Block has been fully completed, connecting the pipeline from G02 valve room to N06 valve room. The first-pass qualification rate for the line welding reached 97.8%.
- Read(150021)
- [NEWS]The quality of Xionggu pipeline automatic welding machine is trustworthy2023-05-16- 13:52
- Xionggu Pipeline Automatic Welding Machine A-300X in the 1st lot of the 3rd West to East Gas Pipeline Project
- Read(3118)
- [OUR CASES]Xionggu Pipeline Automatic Welding Machine Assists the 2nd lot of directional drilling in the middle section of the 3rd West-East gas pipeline2023-04-10- 14:54
- The welding of the 2nd lot of directional drilling for the Zhongwei-Zaoyang section of the 3rd West to East gas pipeline (Zhongwei-Ji'an) began on February 3, 2023. The EPC contractor is Sichuan Oil Engineering & Construction Co., Ltd.
- Read(3144)
- [NEWS]Xionggu Pipeline Automatic Welding Machine Newsletter: The construction of the first lot of the 3rd West East Gas Pipeline has resumed2023-02-22- 15:54
- On January 30, the Xionggu pipeline automatic welding machine service team learned from the project office of the middle section (Zhongwei Ji'an) project (Zhongwei Zaoyang section) of the 3rd West to East gas pipeline that the engineering equipment and construction personnel at the construction site of the first lot of the project have arrived and are now fully resuming work and working hard to catch up with the schedule.
- Read(3146)